Rynovar · PLAYER PORTAL
Changelog
275 saved work records. Dates and status come from the original records; an audit or prepared update does not mean a completed release. Missing dates are shown as not recorded.
| Type | Where | Date | Description |
|---|---|---|---|
![]() |
![]() |
29.09.2026 | Website Optional mainland start and Rookgaard reward protection Installed; further testing pending Implemented the optional level-eight mainland start while keeping Rookgaard as the default. Shared starter kits, persistent starting-path tracking and graduation-reward protection were included. |
![]() |
![]() |
25.09.2026 | Client Client background restored Published / verified Published the corrected Rynovar background from the source client and checked updater, launcher and archive consistency. The date comes from the release record, not the enclosing work-folder date. |
![]() |
![]() |
25.09.2026 | Server Public domain and startup setup Installed; further testing pending Updated the public domain, startup sequence and client endpoints. Local service and release checks passed; the September report still listed outside-network access, public HTTPS and cold-start checks as pending. |
![]() |
![]() |
24.09.2026 | Client Rynovar launcher, branding and downloads Published / verified Published the Rynovar launcher and client branding, repaired updater version compatibility, and verified both the new and compatibility download packages. |
![]() |
![]() |
24.09.2026 | Client Shop artwork and dark theme Published / verified Published the refreshed shop artwork, separate category icons and dark green/gold styling while retaining catalog prices and purchase behavior. |
![]() |
![]() |
22.09.2026 | Website Green and gold website redesign Published / verified Installed the client-inspired website theme, responsive portal, account pages, navigation and table styling. The original report documents website route, asset, login and desktop/phone checks. |
![]() |
![]() |
21.09.2026 | Server Server migration and content conversion Installed; further testing pending The 21 September handoff records completed map/item conversion, equipment and spell compatibility checks, custom monsters and imported NPCs. NPC loading was verified; full dialogue and gameplay testing remained open. |
![]() |
![]() |
20.09.2026 | Server Original project inventory Audit / review Documented the existing server, website, client and release structure in the original September project inventory. This is the inspection date, not a claimed server start date. |



